
Add to Cart
1. JLS-35 3 Phase Oil Immersed Power Combined Transformer Ct Pt Metering Unit
JLS-35 three-phase outdoor dry high-voltage power metering box (combined transformer) is made up of two or three single-phase voltage transformers and current transformer. PT and CT are both electromagnetic type.
This type of transformer is application to 50 HZ (rated frequency), three-phase AC, 6kv, 10kv(rated voltage) electric net for power measuring. It is fixed on the high-voltage side of power supply transformer. There is one three-phase active watt-hour meter and one reactive watt-hour meter installed inside measuring box, which are used to directly measure active and reactive electric in high-voltage circuits.
4. Factory
1. Send the technical data, better for all useful information; we will make a good recommendation.
2. The lead time depend on quantity of order. Some standard type is on stock. Otherwise, it will take 3-15 days.
3. All our activities are accredited to ISO 14001:2015 and IEC standard.